Figure 3-63 Rules for installing integrated management cards (single-row aisle
containment, 2N scenario)
NO TICE
● The following describes how to install integrated management cards in a
single-row aisle containment (2N scenario).
● One integrated management card needs to be installed on the general input
unit closest to the ECC. Other integrated management cards need to be
installed on the power distribution unit adjacent to the general input unit, and
they need to be routed continuously.
----End
3.10 Installing Monitoring Devices
3.10.1 Installing a Smart ETH Gateway
Preparations
Tool: Phillips screwdriver
Materials: smart ETH gateway and accessories
Procedure
Step 1 Use two M4x10 screw assemblies to secure the guide rail for the smart ETH
gateway to the cable trough, as shown in
FusionModule2000-S Smart Modular Data Center
User Manual
3 Hardware Installation
Issue 03 (2021-07-15)
Copyright © Huawei Technologies Co., Ltd.
66