Step 8 Set the ATS controller to auto mode.
----End
5.2.1.2 Powering On the UPS
Prerequisites
The surge protection switch is turned on.
Before powering on the UPS, Measure the voltage and frequency of the upstream
power distribution switch of the UPS cabinet. Ensure that the phase voltage is
within the range of 80–280 V AC and the frequency is within the range of 40–70
Hz.
Procedure
Step 1 (Skip this step in the case of ATS input.) Turn on the MCCB.
Step 2 Turn on the UPS input circuit breaker QF1.
The UPS is powered by the mains and initialization begins. The LCD displays the
Huawei logo and an initialization progress bar.
----End
5.2.1.3 Initial Startup
NO TICE
● If the UPS is powered on for the first time, you need to obtain the startup
password from the Service Expert app. Skip this step if the UPS is not powered
on for the first time.
● The Service Expert app can be downloaded from Google Play Store and can
run on Android.
● This document corresponds to the app version V100R001C00SPC111.
5.2.1.3.1 Obtaining Startup Password