1-877-789-3245 | [email protected] | www.reliance-foundry.com
Martello Bollard Installation
Embedded Mounting
Parts List
Installation Equipment
#
PART
QTY
1
Bollard Body
1
2
Bollard Cover with Reflective Strip
1
3
Concrete Anchor
2
Measuring Tape
Chalk/Marker
Auger
Level
Dirt Tamper
Shovel
To protect the finish, keep bollards in original
packaging until exact moment of installation.
Handle with care to avoid scratching or
damaging bollard surfaces.
Once scratched, bollards cannot be repaired
to original form without re-finishing the entire
surface.
Consider local soil conditions before proceeding
with bollard installation.
Before Installation
STEP 1:
Always check for hazards such as water pipes,
gas lines, and underground wiring before digging.
STEP 2:
Study the site plans and mark the precise center
point of each bollard.
STEP 3:
Please consult your local Building Code
Department to determine the recommended depth
below the frost line for digging in your area. Choose a
minimum of this or 18", whichever is greater. This is the
total depth for digging. The diameter of the hole should
extend to a minimum of 42".
Note: If you have specific
impact requirements, please consult your local civil
engineer.
STEP 4:
Center the auger on the installation mark and
bore a hole to the required depth and diameter.
R-7651-EM
SECTION W-W
SCALE 0.38 : 1
W
W
1
2
3
1
2
3
42"
FROST LINE
18"