NO TE
● If the number of IT cabinets on both sides of the smart cooling product is the same,
preferentially deploy the sensors on the left cabinet.
● If the number of IT cabinets on both sides of the smart cooling product is different,
evenly deploy the sensors based on the actual situation of cabinets.
Figure 3-105 Scenario with the same number of cabinets
Figure 3-106 Scenario with different numbers of cabinets
----End
3.10.12 Installing T/H Sensors (02312PBL)
Context
In the cold and hot aisle containment scenario, T/H sensors are required for the
front and rear doors of every six IT cabinets.
Procedure
Step 1 Secure the T/H sensor base to the 33 U position on the IT cabinet door frame
using M5x10 tapping screws.
FusionModule2000-S Smart Modular Data Center
User Manual
3 Hardware Installation
Issue 03 (2021-07-15)
Copyright © Huawei Technologies Co., Ltd.
89