![Huawei NetCol8000-A Series User Manual Download Page 78](http://html.mh-extra.com/html/huawei/netcol8000-a-series/netcol8000-a-series_user-manual_166611078.webp)
RS485.
shows the communications cable ports on the main control
board.
Figure 3-48 Ports on the two main control boards
(1) Teamwork communications port 1
(2) Teamwork communications port 2
(3) DIP switch
EMS Monitoring
Connect the RS485 cable from the EMS to the teamwork communication port 1 or
2 of the smart cooling product, as shown in
.
Figure 3-49 EMS monitoring
Teamwork Networking
If only teamwork communication is required, reserve the teamwork
communication port 1 of the first unit, connect the teamwork communication port
2 of the unit to the teamwork communication port 1 of the second unit, and
connect the teamwork communication port 2 of the second unit to the teamwork
communication port 1 of the third unit. All units that require teamwork can be
connected in this way, as shown in
.
NetCol8000-A(050, 100) In-room Air Cooled Smart
Cooling Product
User Manual
3 Installation Guide
Issue 12 (2020-10-28)
Copyright © Huawei Technologies Co., Ltd.
69