2. Add a PD7777 electricity meter.
Table 8-20 Adding a PD7777 electricity meter
Path
Parameter
Setting
Choose
System
Settings >
Device
Management
and click Add
Device.
Device
attribute
Select Electricity Meter from the drop-
down list box.
Device Type
Select CHNT-PD7777-3S3 from the drop-
down list box.
Connect To
Select ECC800 from the drop-down list
box.
Communicati
ons Port
Select COM1 from the drop-down list box.
NOTE
The setting example indicates that the PD7777
electricity meter is connected to the COM1 port
on the ECC800-Pro. If the PD7777 electricity
meter is connected to another port, enter the
number of the connected port.
Device
Address
In this example, Device Address is set to
15. During actual configuration, set the
device address for the PD7777 electricity
meter based on the actual situation.
3. Click Test Connect to check whether the PD7777 electricity meter is properly
connected to the ECC800-Pro.
–
If the PD7777 electricity meter connects to the ECC800-Pro successfully,
click Confirm. The connected devices are displayed in the Number of
connected devices list.
–
If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.
----End
8.1.7.21 How Can I Set and Add a NetCol5000-A011/A025/A035/A042/A050
(Modbus-TCP)?
Prerequisites
One end of the straight-through cable has been connected to the FE_1 port on the
NetCol5000-A011/A025/A035/A042/A050 main control board, and the other end
has been connected to the PoE port on the ETH converter.
Context
The following describes how to set and add a NetCol5000-A042.
ECC800 Data Center Controller
User Manual (for ECC800-Pro)
8 FAQ
Issue 02 (2020-09-07)
Copyright © Huawei Technologies Co., Ltd.
288