ENGINEERING MANUAL OF AUTOMATIC CONTROL
CHILLER, BOILER, AND DISTRIBUTION SYSTEM CONTROL APPLICATIONS
357
No pump head control example, so far, takes advantage of
both the variable speed pump and a digital control system. The
digital control system VSD control algorithm adjusts the
differential pressure setpoint based on the demands of all the
valves (Fig. 81) and all loads are satisfied with significant
savings over any of the three fixed setpoint options. Since, when
using valve position load reset there is no difference in
performance between the three locations, DP-1 is preferred
because of initial cost. Valve position load reset provides
adequate control performance whether the sensor is only
proportional or is only a static pressure sensor as compared to
a differential pressure sensor.
Specification:
Anytime any AHU chilled water valve is greater than 15%
open for greater than one minute, the secondary pump shall be
started under EPID control at 20% speed and with a ramp
duration of 120 seconds. The pump VSD shall be controlled by
a differential pressure sensor located between the supply line
leaving the plant room, as far from the pump as practical to
avoid hydronic noise that may be present at the immediate pump
discharge, and the system return line. At start-up the differential
pressure setpoint shall be 30 ft (See Note 1). Anytime any load
control valve is greater than 95% open, the differential pressure
setpoint shall be incremented at the rate of 0.5 ft every minute
up to a maximum value of 38 ft. Anytime all load control valves
are less than 80% open, the differential pressure setpoint shall
be decremented at the same rate down to a minimum of 7 ft.
After 12 minutes, the increment/decrement rate shall be changed
from one minute to three minutes (See Note 2). All values shall
be user adjustable.
NOTES:
1. From Figure 81, pump head is 36 feet if all AHUs require
full flow, therefore, the 30 foot value is an arbitrary
compromise.
2. This relaxes the control demands for smooth stability after
the response to the initial load.
Figure 81 shows the ideal performance of the load reset
setpoint control with each AHU demanding one-third flow. All
control valves are full open and the differential pressure adjusted
to produce a speed of 525 RPM. If the coil loading is non-
symmetrical to the point that AHUs 1 and 2 are fully loaded
while the others are off, the operating point for 1/3 system flow
is the same as shown in Figure 80 for 1/3 system flow, since
AHU 1 requires a differential pressure of 28 ft for full flow.
Fig. 81. Variable Setpoint, Variable Speed
Pumping Control (Ideal Curve).
Pump Speed Valve Position Load Reset
A pump speed valve position load reset program with over 20
valves can become cumbersome. Also, if any one valve, for
whatever reason, stays open most of the time, then the load reset
program becomes ineffective. Figure 82 shows an example of the
valve position load reset program concept applied to a
multibuilding facility with varying differential pressures entering
each building, due to varying distances from the pumping plant.
The example address two issues, differential pressure control
within each building to relieve control valves from extremely high
differential pressures and pump speed load reset.
FULL LOAD
OPERATING
POINT
PUMP CURVE
@ 1750 RPM
48
42
36
30
24
18
12
6
0
0
200
400
600
800
1000
SYSTEM CURVE FOR STATIC
ELEMENTS OF SYSTEM (CHILLER,
PIPING, FITTINGS, BALANCING
COCKS, COILS, STRAINERS, ETC.)
1200
OPERATING POINT LINE AS FLOW
PER AHU VARIES FROM 200 GPM TO
ZERO GPM AND THE DIFFERENTIAL
PRESSURE IS RESET DOWN AS
REQUIRED TO KEEP AHU VALVE
WITH THE GREATEST DEMAND FULL
OPEN
EACH CONTROL VALVE
FULL OPEN AT 200 GPM
& 8 FT DROP
VALVE POSITION LOAD
RESET AND
PROPORTIONAL PLUS
INTEGRAL CONTROL
PUMP REQUIRED:
1200 GPM @ 36' HEAD
PUMP CURVE
@ 525 RPM
M15068
FLOW IN GPM
TOT
AL HEAD IN FT
Summary of Contents for AUTOMATIC CONTROL
Page 4: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL iv ...
Page 6: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL vi ...
Page 11: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL CONTROL FUNDAMENTALS 1 CONTROL SYSTEMS FUNDMENTALS ...
Page 12: ......
Page 46: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL CONTROL FUNDAMENTALS 36 ...
Page 66: ...PSYCHROMETRIC CHART FUNDAMENTALS 56 ENGINEERING MANUAL OF AUTOMATIC CONTROL ...
Page 128: ...ENGINEERING MANUAL OF AUTOMATION CONTROL ELECTRIC CONTROL FUNDAMENTALS 118 ...
Page 158: ...MICROPROCESSOR BASED DDC FUNDAMENTALS 148 ENGINEERING MANUAL OF AUTOMATIC CONTROL ...
Page 210: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL BUILDING MANAGEMENT SYSTEM FUNDAMENTALS 200 ...
Page 440: ...ENGINEERING MANULA OF AUTOMATIC CONTROL INDIVIDUAL ROOM CONTROL APPLICATIONS 430 ...
Page 516: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL GENERAL ENGINEERING DATA 506 Notes ...
Page 517: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL GENERAL ENGINEERING DATA 507 Notes ...
Page 518: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL GENERAL ENGINEERING DATA 508 ...