4 Planning and installation – Scope of delivery
44
4.3 Scope of delivery
Included in the scope of delivery:
•
HDG M299/300/350/400 boiler
•
Control cabinet model EMD-C 215 Exclusiv
•
Feeding system (customer-specific)
•
Delivery system (customer-specific)
•
Cleaning tools
•
Operating documentation
Upon delivery, check that the scope of delivery matches the
information on the delivery note.
The HDG M299/300/350/400 boiler is delivered disassembled. The
combustion unit, heat exchanger, cladding and all other
components must be assembled on site. To unload individual
components, a suitable lifting device able to lift at least 4 tonnes
should be made available at the site.
4.4 Installing the heating system
R
EQUIREMENTS
The heating system will initially be commissioned by specialists from
HDG Bavaria or from an authorised HDG partner and a qualified
electrician.
Danger!
Risk of material damage and injury due to incorrect installation
Installing the system requires comprehensive specialist knowledge.
If installed by untrained persons, the heating system can be
damaged and persons may be injured due to secondary damage.
Only allow authorised specialists to perform the installation.
Danger!
Dangerous electrical current or voltage
Working on live components can result in an electric shock.
Switch off the mains supply to the heating system during the
installation.
Summary of Contents for M299
Page 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Page 2: ......
Page 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 173: ...173 NOTICE ...
Page 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 175: ......