4 Planning and installation – Planning the heating system
31
4 Planning and installation
4.1 Planning the heating system
S
PACE
REQUIREMENTS
* The automatic de-ashing for fly ash 1 or 2 can also be installed in
such a way that both fly ash containers are on the opposite side. This
reduces dimension D to 500 mm.
Figure 4/1 - Space requirements
E
G
D*
B
C
A
F
A
B
C
D*
E
F
G
HDG M299/300/350/400
4400
4250
600
950
500
1400
2000
Table 4/1 - Minimum size (mm)
Summary of Contents for M299
Page 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Page 2: ......
Page 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 173: ...173 NOTICE ...
Page 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 175: ......