4 Planning and installation – Installing the heating system
48
I
NSTALLING
THE
CENTRAL
ASH
REMOVAL
SYSTEM
1. Slide the transfer station (4) with the ash removal augers into the
two ash removal pipes (5).
2. Install the transfer station (4) on the combustion unit (6) using the
M12 hexagon socket screws (10 mm spanner).
3. Mount the auger trough (1) of the ascending auger on the flange
of the transfer station (4) with the M8 screws (13 mm spanner).
4. Insert the downpipe (2) in the opening of the lid of the ash bin (3).
✓
The central ash removal system is now installed.
I
NSTALLING
THE
FEEDING
SYSTEM
HDG TBZ 200
Figure 4/11 - Installing the central ash removal system
1
4
5
3
2
6
Figure 4/12 - Installing the feeding system TBZ 200
5
2
4
3
1
Summary of Contents for M299
Page 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Page 2: ......
Page 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 173: ...173 NOTICE ...
Page 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 175: ......