©
HDG Bavaria GmbH 07/2008
HDG M299/300/350/400 - Version 1 - en
6 Using the heating system – Filling the fuel storage
127
✓
The flue gas fan is running.
✓
You can now begin the cleaning and maintenance work.
✎
See chapter “7 Cleaning and servicing the heating system”.
4.
After completing the cleaning and maintenance work, press the
F5
key under the command
Off
.
✓
The maintenance function is now finished.
5.
Press the
F6
key under the command
End
.
✓
The standard display is restored.
6.13 Filling the fuel storage
R
EQUIREMENTS
The following requirements must be met before the fuel storage can
be filled:
•
The fuel storage has been initially approved by an authorised
specialist.
•
The fuel storage is dry and free of any foreign bodies.
•
Large dust deposits must be removed (with pellet fuel).
•
The requirements of government safety organisations must be
met.
P
ROCEDURE
FOR
FILLING
WITH
WOOD
CHIPS
1.
Turn the heating system main switch on.
✓
The control is activated.
✎
See section “6.2 Switching on the heating system” in this chapter.
2.
Check whether the delivery system is running.
3.
Fill the fuel storage.
✓
The filling of the fuel storage is completed.
Maintenance
: On
Maintenance enabled
FIELD
On
Off
END
Summary of Contents for M299
Page 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Page 2: ......
Page 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 173: ...173 NOTICE ...
Page 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 175: ......