5 Commissioning the system – Procedure
75
1.
When commissioning the system, make sure that the transfer
station (1) is at least half-filled with ash, sand, etc.
F
ILLING
THE
FUEL
STORAGE
✎
See also Chapter “6 Using the heating system”, section
“6.13 Filling the fuel storage”.
1.
Before filling the fuel storage, check the rotational direction, the
intermediate base, the leaf springs and the dosing plate of the
delivery system.
2.
Fill the fuel storage.
✎
See chapter “6 Using the heating system”, section “6.13 Filling the
fuel storage”.
✓
The fuel storage is filled.
Figure 5/1 - Filling the ash accumulation bin
1
The fuel storage may only be filled once the actuators have been
tested.
Warning!
Damage to extraction system during filling.
If the heating system is not switched on during filling of the fuel
storage, the overload protection of the delivery system could be
triggered when the heating system is switched on after the filling.
When filling the fuel storage for the first time, activate the delivery
system by switching in manual operation.
Summary of Contents for M299
Page 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Page 2: ......
Page 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 173: ...173 NOTICE ...
Page 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 175: ......