©
HDG Bavaria GmbH 07/2008
HDG M299/300/350/400 - Version 1 - en
7 Cleaning and servicing the heating system – Procedure
153
7.
Fasten the inspection hatch cover firmly on the flue pipe with the
wing nut.
8.
Deactivate the maintenance function.
✎
See section “Maintenance function” in this chapter.
✓
The cleaning of the flue pipe is completed.
C
LEANING
THE
PRESSURE
EQUALISATION
HOSE
1.
Activate the maintenance function.
✎
See section “Maintenance function” in this chapter.
Caution!
Danger of burns from hot surfaces
The surface of the flue pipe becomes very hot during operation.
Even when turned off, it only cools down slowly.
Switch the heating system off and only start with the cleaning and
maintenance work when the surfaces have cooled down.
3.
Unscrew the wing nut (1) on
the inspection hatch cover (2).
4.
Remove the inspection hatch
cover (2) from the flue pipe
(3).
5.
Check whether the flue gas
pipe (3) needs cleaning.
6.
If necessary, suction the ash
out of the flue pipe using a
vacuum cleaner (3).
Figure 7/22 - Cleaning the flue gas pipe
1
2
3
The pressure equalisation hose is only available in connection with
the HDG feeding system TBZ 150.
Important!
✎
Observe the “Generally applicable safety instructions” in this
section.
Summary of Contents for M299
Page 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Page 2: ......
Page 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 173: ...173 NOTICE ...
Page 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 175: ......