©
HDG Bavaria GmbH 07/2008
HDG M299/300/350/400 - Version 1 - en
7 Cleaning and servicing the heating system – Procedure
155
4.
Pull the ash container (5) forward out of the ash channel (3) of the
ash removal system.
5.
Remove the two cladding sections (1 + 2).
✎
See “Removing the cladding” in this section.
✓
The fly ash section is cleaned.
I
NSPECTING
THE
FUEL
STORAGE
1.
Activate the maintenance function.
✎
See section “Maintenance function” in this chapter.
2.
Allow the fire in the heating system to burn out and cool down.
3.
Open the access hatch.
4.
Inspect the fuel storage for the burning of unsuitable residues or
foreign bodies and remove these if necessary.
5.
Close the access hatch.
6.
Deactivate the maintenance function.
✎
See section “Maintenance function” in this chapter.
✓
The inspection of the fuel storage is completed.
Important!
✎
Observe the “Generally applicable safety instructions” in this
section.
Caution!
Risk of injury from automatically driven components
If the heating system is switched on, the delivery system in the fuel
storage room may start unexpectedly. Hands and feet could
thereby be crushed.
Turn off the main switch and secure it against being turned back on
before you enter the fuel storage room. Follow the advice from the
official safety organisation.
Summary of Contents for M299
Page 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Page 2: ......
Page 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 173: ...173 NOTICE ...
Page 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 175: ......