4 Planning and installation – Installing the heating system
52
I
NSTALLING
THE
CLADDING
I
NSTALLING
THE
CLADDING
BRACKETS
1. Install the cladding brackets with the M10 screws (17 mm
spanner) according to the inscriptions “fr”, “br” and “rl” on the
corners of the boiler.
2. Screw in the M6 adjusting screw (1) on each of the upper three
cladding brackets (10 mm spanner).
When installing the cladding, there are differences depending on
whether the HDG M299/300/350/400 heating system is equipped
with TBZ 150 or TBZ 200.
The procedure described is for installation with equipment version
TBZ 200. Installation with equipment version TBZ 150 is specified
explicitly where necessary.
The substructure of the cladding is inscribed with letters which are
located on the upper end of the visible face for elements that are to
be installed vertically and on the left end of the visible face for
elements that are to be installed horizontally.
Figure 4/15 - Installing the cladding brackets
1
fr_t
fr_b
br_t
br_t
bl_t
rl_b
bl_t
back
right
Summary of Contents for M299
Page 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Page 2: ......
Page 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 173: ...173 NOTICE ...
Page 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 175: ......