4 Planning and installation – Installing the heating system
47
C
ONNECTING
MODULES
2. Place the heat exchanger (1) and the combustion unit (2) next to
each other.
3. Align the two units with plastic plates or flat steel strips (not
included in the scope of delivery) so they are in a horizontal plane.
4. Join the combustion unit (2) and heat exchanger (1) together on
both sides at the intended points (3) using the M12 screws (19 mm
spanner).
✓
The boiler is erected.
Figure 4/10 - Connecting modules
1
3
2