ITTING
THE
ACCUMULATOR
SENSORS
I
NSTALLING
THE
EMD-C 215 E
XCLUSIV
CONTROL
CABINET
Observe the following when installing the EMD-C 215 Exclusiv
control cabinet:
•
Install the control cabinet at least one metre from the flue pipe.
•
Prevent the control cabinet from tipping by fixing it to the wall
securely.
•
If possible, install the control cabinet in such a way that you can
see the boiler when operating the control panel of HDG Control.
•
Install the control cabinet at a height comfortable for you to
operate.
C
ONNECTING
THE
CHIMNEY
✎
See section “4.2 Connections” in this chapter.
1. Connect the flue pipe to the chimney connection.
2. Make sure that the connecting piece does not protrude into the
chimney.
3. Seal the connection to the chimney with highly fireproof silicone
or with a suitable mortar.
✓
The boiler is now connected to the chimney.
4.5 Delivery system
G
ENERAL
INFORMATION
The description for planning, installation and operation of the
employed delivery system can be found in the corresponding
operating manual.
✎
See the operating manual “Delivery system”.
The sensors for the accumulator are stored in the EMD-C 215
Exclusiv control cabinet for further use.
Warning!
Danger of injury
The control cabinet is heavy. Hands and feet could be crushed
during installation.
Summary of Contents for M299
Page 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Page 2: ......
Page 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 173: ...173 NOTICE ...
Page 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 175: ......