4 Planning and installation – Installing the heating system
59
31.Insert suspension rail (O) with the right end in the vertical rail (N)
and fasten it with the M6 hexagon socket screws (5 mm spanner)
and intermediate washer to the vertical rail (N) or the corner
support.
32.Set the vertical rail (Q) in the suspension rails.
33.Set the vertical rail (R) in the suspension rails.
A
LIGNING
THE
SUSPENSION
RAILS
34.Align the corner support (3) vertically with the aid of a spirit level.
35.Tighten the three M6 hexagon socket screws (5 mm spanner).
36.Align the support rail (1) horizontally using the adjusting screw in
the cladding bracket and a spirit level.
37.Align the corner support (2) vertically with the aid of a spirit level.
38.Tighten the three M6 hexagon socket screws (5 mm spanner).
39.Proceed with the alignment of the suspension rails in the same
manner as described above for the remaining three sides of the
boiler.
I
NSTALLING
THE
BASE
CLADDING
HDG TBZ 200
Figure 4/22 - Aligning the suspension rails
3
1
2
Important!
Adhere to the specified sequence when installing the base
cladding. The sequence is indicated by the numbers with asterisk
(e.g. 1*, 2*, etc.).
Summary of Contents for M299
Page 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Page 2: ......
Page 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 173: ...173 NOTICE ...
Page 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Page 175: ......