GETTING STARTED
41
Power Up & Self Test
Panel operation
1.
Connect the power cord
to the power socket.
2.
Turn the external power
switch on.
3.
Hold the power button
on the front panel to
turn on the power.
The power button turns
green from red (standby).
WARNING
Ensure that the power outlet has a ground socket. The
power outlet will have a ground connection if it is a 3
socket type.
Upon turning on, the Mainframe will perform a
self-test. The self-test checks the System, followed
by any attached channels.
NOTE
When the firmware version of the mainframe and the
slave are not identical, a message “The firmware will
be updated, please access to website
www.gwinstek.com to confirm the firmware version.”
will appear on the mainframe.
Summary of Contents for PEL-2000B Series
Page 1: ...Programmable DC Electronic Load PEL 2000B Series USER MANUAL ISO 9001 CERTIFIED MANUFACTURER...
Page 5: ...Table of Contents 5 INDEX 312...
Page 113: ...TUTORIALS 113 14 Sound Turn the sound on off for the mainframe IU Page 202...
Page 309: ...APPENDIX 309 PEL 2004B 435 4 177 532 3 195 3 481 8 554 1 533 3 583 3...
Page 310: ...PEL 2000B Series User Manual 310 PEL 2020B PEL 2030B PEL 2040B PEL 2041B 81 6 171 2 475 446 8...
Page 317: ...INDEX 317 Wiring procedure 46...