PEL-2000B Series User Manual
110
Channel Control
The Channel Control connectors on the rear panel can be used to
control and monitor the status of up to 8 channels. For more
information on channel control, see page 87.
DUT
DUT
DUT
DUT
External control
Step
Description
Details
1.
Setup
Ensure the load and PEL-2000B
series mainframe is turned off.
2.
Choose the appropriate load
module(s).
Page 36
3.
Connection
Connect the terminals to the DUT. Page 43
4.
Connect the channel control
connectors on the rear panel.
5.
Turn on the PEL-2000B series
mainframe and DUT (load).
6.
Configure
Select the Mode* and Range* via
the front panel.
CC Pages 125,
125
CV Page 138
7.
Activate channel control for each
channel that will be used for
external control, i.e., set CH CONT
to External.
Page 183
Summary of Contents for PEL-2000B Series
Page 1: ...Programmable DC Electronic Load PEL 2000B Series USER MANUAL ISO 9001 CERTIFIED MANUFACTURER...
Page 5: ...Table of Contents 5 INDEX 312...
Page 113: ...TUTORIALS 113 14 Sound Turn the sound on off for the mainframe IU Page 202...
Page 309: ...APPENDIX 309 PEL 2004B 435 4 177 532 3 195 3 481 8 554 1 533 3 583 3...
Page 310: ...PEL 2000B Series User Manual 310 PEL 2020B PEL 2030B PEL 2040B PEL 2041B 81 6 171 2 475 446 8...
Page 317: ...INDEX 317 Wiring procedure 46...