TUTORIALS
107
Sequences
Sequences are used to accurately simulate loads. As each Sequence
is independent, Sequences are ideally suited to test multiple output
power sources.
DUT
Step
Description
Details
1.
Setup
Choose the appropriate load
module(s).
Page 36
2.
Connection
Connect the terminals to the DUT. Page 43
3.
Channel
selection
Select a load channel with the
mainframe.
Page 123
4.
Channel
setup
Create a sequence.
Page 158
5.
Sequence
loop
Create a sequence loop if
necessary.
Page 160
6.
Multiple
channels
If multiple channels need to be
configured, follow steps 1-5 for
any remaining channels.
7.
Channel
Duration
menu
Edit the sequence channel
duration information. Ensure that
the channels containing Sequences
are not set to OFF.
Page 162
8.
Trigger
Settings
Set Trigger Out and In channels, if
appropriate.
9.
Run
Run the Sequence(s)
Page 165
Summary of Contents for PEL-2000B Series
Page 1: ...Programmable DC Electronic Load PEL 2000B Series USER MANUAL ISO 9001 CERTIFIED MANUFACTURER...
Page 5: ...Table of Contents 5 INDEX 312...
Page 113: ...TUTORIALS 113 14 Sound Turn the sound on off for the mainframe IU Page 202...
Page 309: ...APPENDIX 309 PEL 2004B 435 4 177 532 3 195 3 481 8 554 1 533 3 583 3...
Page 310: ...PEL 2000B Series User Manual 310 PEL 2020B PEL 2030B PEL 2040B PEL 2041B 81 6 171 2 475 446 8...
Page 317: ...INDEX 317 Wiring procedure 46...