
Chapter 12 - Optional Accessories -
197
G8 Super Cruiser Operator’s Manual MY19 - REV 0
Right:
Meter unit &
Spacer
PHASE A.
The pump presses the grease into grease
channel (1). The grease pushes plunger (4) past
channel (2). The grease now fills chamber (3) and
pushes plunger (5) to the right. The stroke length
of plunger (5) will determine the amount of grease
that will be pressed through the secondary grease
line to the grease point. This stroke length - hence
the capacity of chamber (3) – is determined by
the number and thickness of the spacers as shown
above.
Right:
Meter unit in
phase A
PHASE B.
When the pump stops and as the grease
pressure drops, spring (7) will push plunger (4)
back to the left, closing off channel (1). O-ring
(9) prevents grease from being sucked back from
chamber (6). Plunger (5) is pushed back by spring
(10) and presses the grease in chamber (3), via
channel (2), to chamber (8).
Right:
Meter unit
in phase B
Groeneveld Auto Greaser - Meter Unit Operation
Continued over page
Summary of Contents for Super Cruiser G8
Page 1: ...Super Cruiser G8 Operator s Manual MY19 GA8700989 REV 0 APR 2019 FROM SERIAL 202114 ...
Page 12: ...8 Chapter 2 Safety G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 18: ...14 Chapter 3 General Information Specs G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 58: ...54 Chapter 4 Cabin G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 74: ...70 Chapter 7 Pre Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 104: ...100 Chapter 8 Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 210: ...www goldacres com au ...