Chapter 10 - Lubrication & Maintenance -
137
G8 Super Cruiser Operator’s Manual MY19 - REV 0
PROCEDURE TO EVACUATE AIR BAGS FOR
TRAILER TRANSPORT
Loosen the drain tap on the air tank and drain
the air. Loosen the fitting on the top of the air bag
mount and release the air in the air bags. The air bags
will lower on to the bump stops. Once the machine
is on the bump stops tighten up the air tank valves
and the fittings to the air bags. Don’t alter or change
the height control valve linkages to release the air.
Ride Height Valve Adjustment
The ride height valves are used to adjust the air
pressure within the air bags to maintain the correct
ride height. There are two ride height valves located
on each side of the rear axle and one located in the
centre of the front axle.
The ride height can be adjusted by loosening the
hose clamp attached to the vertical rod on the end
of the ride height valve and then moving the valve
arm in the required direction.
When the sprayer has been unused for a period of
time, the air bags may deflate, this is normal. They will
refill when the machine is started.
Suspension
B
C
D
1
2
A
3
2
1
4
B
A
5
6
UNLESS OTHERWISE SPECIFIED:
DIMENSIONS ARE IN MILLIMETERS
DEBUR ALL EDGES
MATERIAL:
DO NOT SCALE DRAWING
GOLDACRES
TITLE:
DWG NO:
SCALE:1:2.5
SHEET 1 OF 1
A4
C
rear left ride height valve - op manual - 2011 SP
REV NO
CHANGE
APPL DATE
DATE CREATED:
DRAWN:
Name
1-3 MORANG CR
MITCHELL PARK 3352
PH: 03 53426399
FAX: 03 53426308
30/05/2011
DATE EDITED:
30/05/2011
Matt
Above:
To lower the machine, move the arm down
the vertical rod.
B
C
D
1
2
A
3
2
1
4
B
A
5
6
UNLESS OTHERWISE SPECIFIED:
DIMENSIONS ARE IN MILLIMETERS
DEBUR ALL EDGES
MATERIAL:
DO NOT SCALE DRAWING
GOLDACRES
TITLE:
DWG NO:
SCALE:1:2.5
SHEET 1 OF 1
A4
C
rear left ride height valve - op manual - 2011 SP
REV NO
CHANGE
APPL DATE
DATE CREATED:
DRAWN:
Name
1-3 MORANG CR
MITCHELL PARK 3352
PH: 03 53426399
FAX: 03 53426308
30/05/2011
DATE EDITED:
30/05/2011
Matt
Above:
To raise the machine, move the arm up the
vertical rod.
FRONT
340 (+-5) mm
REAR
280 (+-5) mm
Summary of Contents for Super Cruiser G8
Page 1: ...Super Cruiser G8 Operator s Manual MY19 GA8700989 REV 0 APR 2019 FROM SERIAL 202114 ...
Page 12: ...8 Chapter 2 Safety G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 18: ...14 Chapter 3 General Information Specs G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 58: ...54 Chapter 4 Cabin G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 74: ...70 Chapter 7 Pre Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 104: ...100 Chapter 8 Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 210: ...www goldacres com au ...