
Chapter 9 - Boom - 127
G8 Super Cruiser Operator’s Manual MY19 - REV 0
Lower pivot plates
sit level
D
E
F
C
1
2
3
4
B
A
3
2
1
5
C
D
4
6
7
8
A
B
A3
SHEET 2 OF 2
SCALE:1:3
DWG NO.
TITLE:
GOLDACRES
DO NOT SCALE DRAWING
MATERIAL:
DATE CREATED:
DRAWN:
1-3 MORANG CR
MITCHELL PARK 3352
PH: 03 53426399
FAX: 03 53426308
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN MILLIMETERS
DEBUR ALL EDGES
GA4906305
7/08/2013
Matt
REV NO
CHANGE
DATE
ECN NO.
DATE EDITED:
22/10/2012
Figure A
52
D
E
F
C
1
2
3
4
B
A
3
2
1
5
C
D
4
6
7
8
A
B
A3
SHEET 2 OF 2
SCALE:1:3
DWG NO.
TITLE:
GOLDACRES
DO NOT SCALE DRAWING
MATERIAL:
DATE CREATED:
DRAWN:
1-3 MORANG CR
MITCHELL PARK 3352
PH: 03 53426399
FAX: 03 53426308
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN MILLIMETERS
DEBUR ALL EDGES
GA4906305
13/08/2013
Matt
REV NO
CHANGE
DATE
ECN NO.
DATE EDITED:
22/10/2012
Figure B
Figure C
Hole in sprocket aligns
with hole in pivot plate
when adjusted correctly
Hole used when performing
maintenance on breakaway
D
E
F
C
1
2
3
4
B
A
3
2
1
5
C
D
4
6
7
8
A
B
A3
SHEET 2 OF 2
SCALE:1:3
DWG NO.
TITLE:
GOLDACRES
DO NOT SCALE DRAWING
MATERIAL:
DATE CREATED:
DRAWN:
1-3 MORANG CR
MITCHELL PARK 3352
PH: 03 53426399
FAX: 03 53426308
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN MILLIMETERS
DEBUR ALL EDGES
GA4906305
7/08/2013
Matt
REV NO
CHANGE
DATE
ECN NO.
DATE EDITED:
22/10/2012
D
E
F
C
1
2
3
4
B
A
3
2
1
5
C
D
4
6
7
8
A
B
A3
SHEET 2 OF 2
SCALE:1:3
DWG NO.
TITLE:
GOLDACRES
DO NOT SCALE DRAWING
MATERIAL:
DATE CREATED:
DRAWN:
1-3 MORANG CR
MITCHELL PARK 3352
PH: 03 53426399
FAX: 03 53426308
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN MILLIMETERS
DEBUR ALL EDGES
GA4906305
7/08/2013
Matt
REV NO
CHANGE
DATE
ECN NO.
DATE EDITED:
22/10/2012
Three Dimensional Breakaway - 36-48 m
Initial Setup
1. Open the boom fully into the working position
and lower to a good working height.
2. Close the ball valves on the two hydraulic lift
cylinders for safety purposes.
3. The lower pivot plates need to be in line with
each other (fig. A).
4. If the rose end is removed for any reason, anti
seize should be applied to the thread before it is
screwed into the boom tip. The rose end should
be screwed into the breakaway tip so that it
measures 52 mm from the boom tip face plate to
the centre of the rose end (fig. B). Apply Loctite
243 thread lock to the grub screw and fasten.
5. The small hole in the sprocket must align with the
hole in the side of the pivot plate. This is adjusted
by tightening or loosening the turnbuckle (fig. C).
6. The spring tension must be adjusted so there is
a 1-2 mm gap between the coils. This applies the
ideal amount of resistance when breaking away.
The spring tension can be adjusted by tightening
or loosening the eye bolt.
TO ADJUST TURNBUCKLE
Pull the boom tip back until the large hole in the
sprocket aligns with the hole in the pivot side plate,
put a pin through the holes and release the tip.
Make adjustments to turnbuckle. Pull tip back and
remove the pin. Release the tip and check alignment
of small hole in sprocket with pivot plate.
Repeat previous steps until the small hole in the
sprocket and hole in the side plate align.
Maintenance
There are several things that need to be done
to ensure that the breakaway will be functioning
properly.
• There are two main things that are critical to
the breakaway functioning correctly. The small
hole in the sprocket needs to align with the hole
in the side of the pivot plate (see step 5 - Initial
Setup) and the spring tension. Check these on a
regular basis and adjust as required.
• The spring will stretch over time and will lose
tension. A spring is worn and should be replaced
when there is no tension on the spring and it
doesn’t fully retract.
• To ensure the smooth and long lasting
operation of the breakaway mechanism, it must
be lubricated on a regular basis. The sprocket
pivot, chain and lower rose joints should be
oiled with a wet lubricant every 8 hours. The
upper rose joint should be greased every 8
hours.
Summary of Contents for Super Cruiser G8
Page 1: ...Super Cruiser G8 Operator s Manual MY19 GA8700989 REV 0 APR 2019 FROM SERIAL 202114 ...
Page 12: ...8 Chapter 2 Safety G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 18: ...14 Chapter 3 General Information Specs G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 58: ...54 Chapter 4 Cabin G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 74: ...70 Chapter 7 Pre Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 104: ...100 Chapter 8 Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Page 210: ...www goldacres com au ...