HYDRAULIC BOOSTER 5D2-5
Inspect
• Studs (10) and (35) for thread damage.
• All rubber parts for nicks or cuts.
• Parts for cracks, distortion, or any evidence of
structural damage.
^
• Machined surfaces for scoring, burrs, or corrosion.
• Replace any damaged parts.
[■►+I Install or Connect (Figures 1 and 6 through
10)
.
Tools required:
J 28681 Seal Installer.
J 8092 Handle.
NOTICE: For steps 24 and 25, see “ N otice”
;
on page 5D2-1.
1. Lubricate the seals and cylinder bores with clean
power steering fluid only.
Figure 7—Installing the Control Valve Snubber
Summary of Contents for C Series 1993
Page 1: ......
Page 12: ...OA 6 GENERAL INFORMATION Figure 11 Allison Transmission I D Location ...
Page 44: ...3B1A 2 POWER STEERING GEAR UNIT REPAIR Figure 1 710 Power Steering Gear ...
Page 62: ......
Page 75: ...3B3 2 POWER STEERING COMPONENTS TRW ROSS ...
Page 121: ...5H 16 AIR BRAKE VALVES Figure 21 Bendix Proportioning Relay Valve Components ...
Page 147: ...5J 10 AIR COMPRESSOR AND GOVERNOR 286 F9051 Figure 18 Bendix BX 2150 Compressor Components i ...
Page 204: ...MODEL 295 TBI UNIT 6C1 3 F7973 Figure 3 Model 295 TBL Unit ...
Page 251: ...6D4 6 37 MT STARTER MOTORS V3022 Figure 8 37 MT Components ...