
Action
Step
• If a calibration has been performed: enter the calculated flow cell path length, obtained
in the calibration procedure, in the Real length input field and click Set.
• If no calibration has been performed: enter the nominal flow cell path length in the
Real length input field and click Set.
Result: The UV flow cell path length is updated.
4
ÄKTA pure User Manual 29119969 AB
315
7 Maintenance
7.7 Calibration procedures
7.7.4 Calibrate the UV monitors
Summary of Contents for AKTApure
Page 1: ...ÄKTA pure User Manual ...
Page 2: ...Page intentionally left blank ...
Page 520: ...Page intentionally left blank ...
Page 521: ...Page intentionally left blank ...