
5.4.1
System pumps
Introduction
This section describes how to prime inlets and purge the System pumps.
Overview
The procedure consists of the following stages:
Description
Stage
Prime all inlet tubing to be used during the run
1
Purge System pump B
2
Validate purge of System pump B
3
Purge System pump A
4
Validate purge of System pump A
5
End the run
6
The procedures for purging the pump heads and priming the inlets using the Process Picture,
are described below. It is also possible to perform the procedures from the Manual instructions
dialog.
Tip:
Prime inlet tubing
Follow the instructions below to fill all A and B inlet tubing to be used in the run with appropriate
buffer/solution.
Action
Step
Make sure that all inlet tubing that is to be used during the method run is placed in the
correct buffer.
1
Open the System Control module.
2
162
ÄKTA pure User Manual 29119969 AB
5 Operation
5.4 Prime inlets and purge pump heads
5.4.1 System pumps
Summary of Contents for AKTApure
Page 1: ...ÄKTA pure User Manual ...
Page 2: ...Page intentionally left blank ...
Page 520: ...Page intentionally left blank ...
Page 521: ...Page intentionally left blank ...