5 Methods
5.10 Requirements for assay-specific evaluation
102
Biacore T100 Software Handbook BR-1006-48 Edition AE
•
Samples in the
Calibration
step must have concentrations specified in the
variable
ConcB-calibration
. At least two different concentrations are
required for linear calibration curves and at least four for 4-parameter
fitting. These samples should contain only component B.
•
Samples in the
Sample
step must have concentrations specified in the
variables
ConcB-fix
and
ConcA-variable
. At least 3 samples with the same
concentration of component B mixed with different concentrations of
component A are required.
5.10.5 Other requirements
Application of solvent correction (see Section 6.7) requires an assay step with
purpose
Solvent Correction
, connected to a cycle type that includes at least
four
Solvent Correction
commands for different solvent concentrations.
Summary of Contents for Biacore T100
Page 1: ...GE Healthcare Biacore T100 Software Handbook ...
Page 2: ......
Page 8: ...8 Biacore T100 Software Handbook BR 1006 48 Edition AE ...
Page 13: ...Biacore T100 Software Handbook BR 1006 48 Edition AE 13 Control Software ...
Page 14: ...14 Biacore T100 Software Handbook BR 1006 48 Edition AE ...
Page 30: ...3 Manual run 3 4 Ending a manual run 30 Biacore T100 Software Handbook BR 1006 48 Edition AE ...
Page 103: ...Biacore T100 Software Handbook BR 1006 48 Edition AE 103 Evaluation Software ...
Page 104: ...104 Biacore T100 Software Handbook BR 1006 48 Edition AE ...
Page 207: ...Biacore T100 Software Handbook BR 1006 48 Edition AE 207 Appendices ...
Page 208: ...208 Biacore T100 Software Handbook BR 1006 48 Edition AE ...
Page 236: ...236 Biacore T100 Software Handbook BR 1006 48 Edition AE ...
Page 237: ......