14-14
14.2 Processing Racks
4. Remove the two coil springs and four bearings
from the drive side.
5. Remove the two coil springs, four C-rings and four
bearings from the front side.
6. Remove the four lower rollers.
Installation
Installation is essentially in the reverse order of removal.
NOTE: Install the rollers and coil springs in the proper
position as shown.
LII600
Springs (2)
Bearings (4)
LII601
Springs (2)
C-rings (4)
Bearings (4)
Rollers (4)