18-26
18.2 Print Sending Unit
3. Remove the two screws and then the motor and
drive belt.
4. Remove the E-ring and then the pulley from the
motor.
Installation
Installation is essentially in the reverse order of
removal.
NOTE: Adjust the belt tension and tighten the motor mount
screws.
Specified Belt Tension:2.0 ±1N/3mm
LII147
Screws (2)
Motor (M771)
Belt
E-ring
Pulley
LII148
2.0N
±
1N/3mm