16-17
16.2 Processing Solution Replenishment System
16
4. Pinch the upper and lower hoses with the two
pinchcocks.
5. Remove the screw and then the sensor from the
bracket.
6. Loosen the hose clamps and disconnect the
hoses from the sensor.
Installation
Installation is essentially in the reverse order of removal.
NOTE: Connect the hoses securely
Removal
1. Remove the connector cover
.
2. Remove the two screws securing the tank bracket
and pull the tank bracket out.
3. Open the clamp and disconnect the sensor
connectors.
4. Remove the two screws and then the level sensors.
LII720
Pinchcocks (2)
Hoses (2)
Screw
Clamp
Sensor
16.2.9
P1R Upper/P2RA/B Upper/P1R Lower/P2RA/B Lower Level
Sensor (FS720/FS721/FS722/FS724/FS725/FS726)
Replacement
LII1197
Screws (2)
Tank Bracket
LII726
Clamp
Connector
Screws (2)
Sensor