7-16
7.1 Auto Film Carrier NC100AY (Pressure Cover Section)
4. Remove the two coil springs.
Installation
Installation is essentially in the reverse order of
removal.
NOTE: • Tighten the two dust removal roller fixing screws
fully and loosen them three turns.
• After installation, insert a film and turn the roller
cleaning knob. The dust removal roller should be
locked when the knob is turned to the feed
direction and turned when the knob is turned to
the return direction
Z
2
265
Springs (2)
Z
2
266
Screws (2) (Loosen 3 turns.)
Z
2
267
Film
Dust Removal Roller
Roller Cleaning Knob