11-48
11.3 Registration Section
4. Remove the two E-rings, two bearings and then
the roller.
Installation
Installation is essentially in the reverse order of removal.
Removal
1. Remove the registration unit
.
2. Remove the two coil springs.
3. Remove the E-ring, bearing and then the roller.
4. Remove the E-ring and bearing.
Installation
Installation is essentially in the reverse order of removal.
LII086
E-rings (2)
Bearings (2)
Roller
11.3.12
Registration Section Nip Roller 3/4 Replacement
LII128
Springs (2)
E-ring
Bearing
Roller
LII129
E-ring
Bearing