![FEC AFC3000 Hardware Operation Manual Download Page 65](http://html.mh-extra.com/html/fec/afc3000/afc3000_hardware-operation-manual_547828065.webp)
Chapter 4 Installation and Wiring
PAGE 4-2
Review Chapters 1 and 2 prior to designing a System.
If the requirements and specifications in these two
(2) Chapters are not addressed, there is a chance of degraded System performance.
WARNING: Follow Lockout/Tagout and other safety precautions when connecting and/or
disconnecting cabling, wiring, and equipment.
№
Item
Contents
Reference Page
1
Select correct tool size
Keep torque range between 50% and 75 % of
tool capability for best performance.
Ensure fastening bolt pattern and tool mounting
patterns are compatible.
PAGE 4-9
2
Design tool mounting plate,
powerhead
and
spindle
assemblies.
Design of mounting plate / powerhead requires
adherence to several specifications.
PAGE 4-16
3
Select correct controller for
the tool selected.
Different tool motors require different Servo
Amplifiers. Ensure the correct one is selected.
PAGE 4-9~12
4
Select
the
circuit
protectors.
Circuit protection for controller should be
separate from other units.
PAGE 4-20
5
Select an air handling unit
(as required).
Select an air handling unit applicable to the
environmental conditions (A/C, Heat Exch., etc.)
PAGE 4-3~6
6 Select an adequate PLC.
Select a PLC which will facilitate direct
connection to the AFC3000 System I/O (24 VDC).
PAGE 4-29
7
Design (or review) PLC
logic.
A PLC logic program can be written using signal
descriptions and timing charts provided.
PAGE 4-30~37
8 Select NEMA 12 enclosure.
Keep clearances among units according to the
recommended installation layout.
PAGE 4-7,8
9 Set MFC Unit dip switches.
Check the setting before connecting the Unit
PAGE 48~50
10
Mount the controller in the
enclosure.
Refer to recommended installation layout.
PAGE 4-8
11 Wire power connections.
Connect the power cables.
VERIFY VOLTAGE
AND POLARITY PRIOR TO APPLYING POWER
PAGE 4-18,19
12 Wire I/O connections.
Connect all I/O wiring.
VERIFY VOLTAGE
SOURCE AND POLARITY PRIOR TO
CONNECTION.
PAGE 4-25~28
13 Connect homerun cables.
VERIFY POWER IS OFF
, then connect cables for
every motor/resolver and preamplifier.
PAGE 4-22
14 Turn on the equipment.
VERIFY WIRING AND THE VOLTAGE OF ALL
POWER SUPPLIES PRIOR TO POWERING UP.
15 Input preset data.
Set the preset data for torque, angle, speed, time,
etc.
16 Verify normal function.
Confirm normal operation.
Summary of Contents for AFC3000
Page 1: ...AFC3000E HW 1 ...
Page 17: ......
Page 18: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Page 25: ......
Page 26: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Page 34: ...Chapter 3 System Description PAGE 3 1 Chapter 3 System Description 3 ...
Page 64: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation and Wiring 4 ...
Page 131: ...Chapter 4 Installation and Wiring PAGE 4 68 Blank Page ...
Page 132: ...Chapter 5 I O Expansion Unit Page 5 1 Chapter 5 I O Expansion Unit 5 ...
Page 164: ...Chapter 6 Power up and Initial Checks PAGE 6 1 Chapter 6 Power Up and Initial Checks 6 ...
Page 168: ...Chapter 7 Fastening Instructions PAGE 7 1 Chapter 7 Fastening Instructions 7 ...
Page 207: ... Blank Page ...
Page 208: ...Chapter 8 System Operation PAGE 8 1 Chapter 8 System Operation 8 ...
Page 259: ...Chapter 8 System Operation PAGE 8 52 ...
Page 260: ...Chapter 9 Maintenance Inspection PAGE 9 1 Chapter 9 Maintenance Inspection 9 ...
Page 268: ...Chapter 10 Troubleshooting PAGE 10 1 Chapter 10 Troubleshooting 10 ...
Page 294: ......