![FEC AFC3000 Hardware Operation Manual Download Page 231](http://html.mh-extra.com/html/fec/afc3000/afc3000_hardware-operation-manual_547828231.webp)
Chapter 8 System Operation
PAGE 8- 24
8-6 Parameter Copy / Erase the Fastening Results History
NOTE
: Copying parameters is performed easier using the AFC3000 Software – this is provided in the
case software is not available
When multiple parameter sets need to be set, one parameter can be copied to another parameter while in
the parameter edit mode.
Parameter copy can be implemented using the following procedure.
1. Operate the arrow pushbuttons to make “Copy,” with “SYS” indicated in the PAR No. display and
“022” indicated in the D-No. display.
2. Change the RUN/BYPASS switch of the Controller to the BYPASS position and then press the
[SET] pushbutton.
3. Select the copy source parameter No. in the first 2 digits of the upper stage of the display (DATA).
4. Select the copy destination parameter No. in the last 2 digits of the upper stage of the display
(DATA).
5. Press the [SET] pushbutton, press the [
▲
] or [
▼
] pushbuttons to change the indication from “Copy
NO” to “Copy YES” within 2 seconds, and then press the [SET] pushbutton again within 2 seconds.
6. Copying one parameter to another parameter is complete.
<Procedure for batch parameter copying>
SET
Copy a parameter
to a parameter
SET
[
▲
] or [
▼
]
Copied FROM Copied TO
*If neither YES or NO is selected within 2 seconds, the command will be cancelled.
Summary of Contents for AFC3000
Page 1: ...AFC3000E HW 1 ...
Page 17: ......
Page 18: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Page 25: ......
Page 26: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Page 34: ...Chapter 3 System Description PAGE 3 1 Chapter 3 System Description 3 ...
Page 64: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation and Wiring 4 ...
Page 131: ...Chapter 4 Installation and Wiring PAGE 4 68 Blank Page ...
Page 132: ...Chapter 5 I O Expansion Unit Page 5 1 Chapter 5 I O Expansion Unit 5 ...
Page 164: ...Chapter 6 Power up and Initial Checks PAGE 6 1 Chapter 6 Power Up and Initial Checks 6 ...
Page 168: ...Chapter 7 Fastening Instructions PAGE 7 1 Chapter 7 Fastening Instructions 7 ...
Page 207: ... Blank Page ...
Page 208: ...Chapter 8 System Operation PAGE 8 1 Chapter 8 System Operation 8 ...
Page 259: ...Chapter 8 System Operation PAGE 8 52 ...
Page 260: ...Chapter 9 Maintenance Inspection PAGE 9 1 Chapter 9 Maintenance Inspection 9 ...
Page 268: ...Chapter 10 Troubleshooting PAGE 10 1 Chapter 10 Troubleshooting 10 ...
Page 294: ......