![FEC AFC3000 Hardware Operation Manual Download Page 152](http://html.mh-extra.com/html/fec/afc3000/afc3000_hardware-operation-manual_547828152.webp)
Chapter 5
I/O
Expansion Unit
Page 5-21
●
Fieldbus Message Output Timing
●
Basic Control Signals: Slave Spindle
●
Delay Time from Input of START Signal to Unit Startup
・
Startup processing time of MASTER spindle for PC communication and I/O (PLC) control: Approx. 170 to
180msec
・
Startup processing time of SLAVE spindle for PC communication and I/O (PLC) control: 3msec (per axis)
Example: Processing time for a 10-axis system = (170 to 180msec) + 3msec × 10 axes
The respective SLAVE spindle are thus started up 200 to 210msec after the MASTER spindle is started
up.
Operation
Operation
Operation
in
progress
・
Output Signals
・
Input Signals
Fastening
OFF: Contact is “Open” from the PLC
ON: Contact i
s “Closed” from the PLC
Fieldbus
Message Output
Fastening
・
Output Signals
Output started
(renewed at the end of the next operation)
2nd Axis BYPASS
1st Axis ACCEPT
1st Axis REJECT
2nd Axis BYPASS
2nd Axis ACCEPT
2nd Axis REJECT
・
Input Signals
Fastening
Operation
in
progress
Summary of Contents for AFC3000
Page 1: ...AFC3000E HW 1 ...
Page 17: ......
Page 18: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Page 25: ......
Page 26: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Page 34: ...Chapter 3 System Description PAGE 3 1 Chapter 3 System Description 3 ...
Page 64: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation and Wiring 4 ...
Page 131: ...Chapter 4 Installation and Wiring PAGE 4 68 Blank Page ...
Page 132: ...Chapter 5 I O Expansion Unit Page 5 1 Chapter 5 I O Expansion Unit 5 ...
Page 164: ...Chapter 6 Power up and Initial Checks PAGE 6 1 Chapter 6 Power Up and Initial Checks 6 ...
Page 168: ...Chapter 7 Fastening Instructions PAGE 7 1 Chapter 7 Fastening Instructions 7 ...
Page 207: ... Blank Page ...
Page 208: ...Chapter 8 System Operation PAGE 8 1 Chapter 8 System Operation 8 ...
Page 259: ...Chapter 8 System Operation PAGE 8 52 ...
Page 260: ...Chapter 9 Maintenance Inspection PAGE 9 1 Chapter 9 Maintenance Inspection 9 ...
Page 268: ...Chapter 10 Troubleshooting PAGE 10 1 Chapter 10 Troubleshooting 10 ...
Page 294: ......