Commissioning
multi EA 4000
68
A window with the same name opens.
12.
In the area A
CCESSORY MODULES
place a tick for E
JECTION RAIL
.
13.
Adjust the position of the gripper relative to the ejection rail (
→
see section "In-
stalling and adjusting the autosampler FPG 48" p. 62).
5.4.4
Measurement cancellation when using the sampler FPG 48
NOTICE
After manual measurement interruption or measurement interruption due to a device
fault move the ceramic hook manually to the limit stop before resuming the measure-
ment process.
5.4.5
Use manual sample feed
CAUTION
There is a risk of burns at the hot the combustion furnace! Allow the basic device to
cool down sufficiently before positioning the manual sample feed!
During sample feed operation, there is a risk of burns at the hot boat and ceramic
hook! After pulling out of the furnace, the boat and hook remain hot for a long time.
1 Gas sluice
2 Ceramic boat
3 Ceramic hook
4 Handle
5 Storage area
1.
Position the manual sample feed in front of
the gas sluice. Align the sample feed until
the ceramic boat is moved exactly in the
center into the gas sluice.
The distance between the sample feed and
the gas sluice should be approx. 2 mm.
2.
Place a boat with the eye on the hook of the
sample feed and carefully move the boat
manually into the furnace.
Caution!
Only touch the hook from the han-
dle. There is a risk of burns on the furnace.
Correct the position of the sample feed if the
boat gets jammed.
3.
Manually remove the hot boats from the
hook with pliers and place them onto the
storage area to cool down.
Summary of Contents for Analytik Jena multi EA 4000
Page 1: ...Operating Manual multi EA 4000 Elementary analyzer C S and Cl solids analysis...
Page 50: ...Commissioning multi EA 4000 50 Figure 32 multi EA 4000 C S Hose diagram...
Page 52: ...Commissioning multi EA 4000 52 Figure 33 multi EA 4000 Cl Hose diagram...
Page 54: ...Commissioning multi EA 4000 54 Figure 34 multi EA C S Cl for C S measurements Hose diagrams...
Page 55: ...multi EA 4000 Commissioning 55 Figure 35 multi EA 4000 C S Cl for Cl measurements...
Page 57: ...multi EA 4000 Commissioning 57 Figure 36 Automatic TIC solids module Hose diagrams...
Page 58: ...Commissioning multi EA 4000 58 Figure 37 multi EA 4000 C S with automatic TIC solids module...
Page 61: ...multi EA 4000 Commissioning 61 Figure 39 multi EA 4000 C S Cl with man TIC solids module...