Maintenance and care
multi EA 4000
112
10.
Place the dust trap onto the ceramic tube and align it
with the gas connection pointing up. Press the dust trap
slightly against the tube towards the tube axis until the
dust trap slips onto the tube and cannot be moved fur-
ther.
11.
Connect the measuring gas hose (hose no. 1) to the gas
connection at the dust trap.
12.
Push the contact guard into the opening in the left-hand
side panel of the basic device.
13.
Position the detector module and accessories back next
to the basic device.
7.2.3
Changing the desiccant in the drying tube
CAUTION
Danger of irritation of eyes, skin and respiratory system! Wear suitable physical protec-
tion when handling magnesium perchlorate and avoid the creation of dust during re-
filling. Keep magnesium perchlorate away from flames. The oxidant can make a fire
worse.
Drying tubes are used in the following measurement arrangements:
C/S measurement at the multi EA 4000 basic device
TIC measurement: in the corresponding TIC solids modules
The desiccant must be changed if water absorption is visible. If the desiccant is discol-
ored by rust or other particles, it must also be changed immediately.
1, 6 Screw closures
2, 5 Retention clips
3 Desiccant
(magnesium perchlorate)
4 Quartz wool
1.
Detach the screw closures at the glass tube.
NOTICE! The seals must not be lost and must be
reinstalled in the same manner.
2.
Remove the desiccant and the quartz wool. Dis-
pose of the desiccant correctly.
3.
Rinse the glass tube and let it dry.
4.
Seal one end of the glass tube approx. 2 cm thick
with quartz wool.
5.
Fill the glass tube with 50 – -60 g of fresh desic-
cant (magnesium perchlorate).
6.
Firmly screw the glass tube in and push it back
into the holder. Do not kink the hoses.
Summary of Contents for Analytik Jena multi EA 4000
Page 1: ...Operating Manual multi EA 4000 Elementary analyzer C S and Cl solids analysis...
Page 50: ...Commissioning multi EA 4000 50 Figure 32 multi EA 4000 C S Hose diagram...
Page 52: ...Commissioning multi EA 4000 52 Figure 33 multi EA 4000 Cl Hose diagram...
Page 54: ...Commissioning multi EA 4000 54 Figure 34 multi EA C S Cl for C S measurements Hose diagrams...
Page 55: ...multi EA 4000 Commissioning 55 Figure 35 multi EA 4000 C S Cl for Cl measurements...
Page 57: ...multi EA 4000 Commissioning 57 Figure 36 Automatic TIC solids module Hose diagrams...
Page 58: ...Commissioning multi EA 4000 58 Figure 37 multi EA 4000 C S with automatic TIC solids module...
Page 61: ...multi EA 4000 Commissioning 61 Figure 39 multi EA 4000 C S Cl with man TIC solids module...