ASE 100 Operator’s Manual
4-4
Doc. 031842-01 5/02
Error 009
Pump volume limit exceeded.
Cause:
If the pump exceeds the volume limit (250 mL), there is
probably a leak somewhere in the system.
Action:
Remove the right side panel of the ASE 100 (see Section 5.3).
Inspect the following fittings for leaks (see Figure 4-1): pump
fittings, pump check valves, pressure transducer fittings, relief
valve fittings, static valve fittings, and solvent line fittings.
Tighten any leaking fittings.
Action:
Pull out the drip tray holder below the oven and check the
plastic drip tray. If the tray contains liquid, remove it from the
holder, dispose of the liquid, and reinstall the tray. Then,
remove the collection bottle and waste bottle from the system.
Remove the lower trim panel and check for leaks near the oven
and the AutoSeal mechanism.
Error 010
Analog-to-digital converter failed.
Cause:
Failure of the main printed circuit board (PCB). The board
must be replaced.
Action:
Contact Dionex for assistance.
Summary of Contents for ASE 100
Page 8: ...ASE 100 Accelerated Solvent Extractor vi Doc 031842 01 5 02...
Page 24: ...ASE 100 Operator s Manual 2 10 Doc 031842 01 5 02 Figure 2 4 ASE 100 Rear Panel...
Page 32: ...ASE 100 Operator s Manual 2 18 Doc 031842 01 5 02...
Page 42: ...ASE 100 Operator s Manual 3 10 Doc 031842 01 5 02 Figure 3 2 Inspecting Cell O Rings...
Page 60: ...ASE 100 Operator s Manual 3 28 Doc 031842 01 5 02...
Page 69: ...4 Troubleshooting Doc 031842 01 5 02 4 9 Figure 4 1 ASE 100 Plumbing Diagram...
Page 106: ...ASE 100 Operator s Manual 5 36 Doc 031842 01 5 02...
Page 110: ...ASE 100 Operator s Manual A 4 Doc 031842 01 5 02...
Page 113: ...B Installation Doc 031842 01 5 02 B 3 Figure B 1 ASE 100 Rear Panel...
Page 150: ...ASE 100 Accelerated Solvent Extractor Index 8 Doc 031842 01 5 02...