B • Installation
Doc. 031842-01 5/02
B-13
B.2.7
Adjusting the Cell Holder
When the ASE 100 is shipped from the factory, the cell holder is
positioned to hold a 100 mL extraction cell (or a long rinse cell). To
accommodate a cell of any other size, move the lower latch of the cell
holder to the appropriate mounting site on the cell door (see Figure B-9).
1. Push the
OPEN
lever down and open the cell door.
2. Use a 3 mm hex-screw driver (P/N 060154) to remove the two hex
screws (P/N 046253) securing the lower latch to the cell door.
NOTE The ASE 100 Ship Kit (P/N 059397) includes two
extra hex screws, in case the original screws are
misplaced.
3. When the latch is correctly installed, the small tab is on the underside
of the latch (see Figure B-8).
If the ASE 100 has recently finished an extraction, the inside of
the cell door may be hot. Put on thermal gloves (P/N 060372)
before adjusting the cell holder, or wait until the system cools
down.
Figure B-8. Correct Orientation of the Lower Latch
Summary of Contents for ASE 100
Page 8: ...ASE 100 Accelerated Solvent Extractor vi Doc 031842 01 5 02...
Page 24: ...ASE 100 Operator s Manual 2 10 Doc 031842 01 5 02 Figure 2 4 ASE 100 Rear Panel...
Page 32: ...ASE 100 Operator s Manual 2 18 Doc 031842 01 5 02...
Page 42: ...ASE 100 Operator s Manual 3 10 Doc 031842 01 5 02 Figure 3 2 Inspecting Cell O Rings...
Page 60: ...ASE 100 Operator s Manual 3 28 Doc 031842 01 5 02...
Page 69: ...4 Troubleshooting Doc 031842 01 5 02 4 9 Figure 4 1 ASE 100 Plumbing Diagram...
Page 106: ...ASE 100 Operator s Manual 5 36 Doc 031842 01 5 02...
Page 110: ...ASE 100 Operator s Manual A 4 Doc 031842 01 5 02...
Page 113: ...B Installation Doc 031842 01 5 02 B 3 Figure B 1 ASE 100 Rear Panel...
Page 150: ...ASE 100 Accelerated Solvent Extractor Index 8 Doc 031842 01 5 02...