Chapter 11: DigiBase
207
About Failed Tasks
The Paused Tasks pane shows any tasks that
could not be completed. The reason for the fail-
ure is shown in the Status column.
Failed Tasks cannot be resumed, and must be de-
leted manually from the Paused Tasks pane.
If Automatically Find and Relink was unable to
find all files in a session, a failed task is placed in
the Paused Tasks pane of the Task window. It re-
mains there unless you manually remove it
from the Task window (even if you have since
found the files through a subsequent search and
relink task).
Task Prioritization
A task that is in progress may be interrupted by
a task of higher priority. When this happens,
the partially completed task is halted and re-
scheduled later in the queue, and shown with a
progress bar in the Active Tasks pane. When the
higher priority task is finished the first incom-
plete task in the queue resumes.
Tips for Using the Task Window
Pause Tasks During Playback
A global preference Pause during Playback is
provided in the Task window Browser menu.
When enabled, Active Tasks are paused when-
ever Pro Tools is playing (or recording). This set-
ting is especially useful when working on slower
CPUs, or whenever you want to minimize sys-
tem load for maximum playback and recording
performance. This Preference maintains its set-
ting until the next time it is changed.
Stored Tasks
Any task that imports files into a session is
stored with a session when it is closed, and re-
sumes when the session is re-opened.
For example, if you Import Tracks with Copy
Media selected, then save and quit before the
copy completes, the copy tasks resume when
the session is reopened.
Grouped Tasks
Some tasks consist of many smaller tasks. For in-
stance, Copy and Relink may require hundreds
of individual files to be copied. To help manage
these tasks, they are grouped under the originat-
ing command. So in the example of a Copy and
Relink command, one Copy task would appear
with an Expand/Collapse icon in the Task win-
dow. Clicking the icon shows each of the indi-
vidual sub-tasks.
If there is more than one grouped task in the
queue, all of the sub-tasks for the first group
must be completed before the sub-tasks of the
second group can be processed.
If the session is saved and closed while several of
these group tasks are in the queue, and if those
tasks are the type that are saved across close and
reopen, all of the tasks appear when the session
is reopened as part of the same group.
Summary of Contents for Pro Tools
Page 1: ...Pro Tools Reference Guide Version 7 3 ...
Page 15: ...1 Part I Introduction ...
Page 16: ...2 ...
Page 33: ...19 Part II System Configuration ...
Page 34: ...20 ...
Page 44: ...Pro Tools Reference Guide 30 ...
Page 94: ...Pro Tools Reference Guide 80 ...
Page 95: ...81 Part III Sessions Tracks ...
Page 96: ...82 ...
Page 108: ...Pro Tools Reference Guide 94 ...
Page 130: ...Pro Tools Reference Guide 116 ...
Page 269: ...255 Part IV Recording ...
Page 270: ...256 ...
Page 310: ...Pro Tools Reference Guide 296 ...
Page 345: ...331 Part V Editing ...
Page 346: ...332 ...
Page 402: ...Pro Tools Reference Guide 388 ...
Page 496: ...Pro Tools Reference Guide 482 ...
Page 548: ...Pro Tools Reference Guide 534 ...
Page 571: ...557 Part VI MIDI Editing ...
Page 572: ...558 ...
Page 596: ...Pro Tools Reference Guide 582 ...
Page 637: ...623 Part VII Mixing ...
Page 638: ...624 ...
Page 702: ...Pro Tools Reference Guide 688 ...
Page 771: ...757 Part VIII Video Sync Surround ...
Page 772: ...758 ...
Page 792: ...Pro Tools Reference Guide 778 ...
Page 806: ...Pro Tools Reference Guide 792 ...
Page 856: ...Pro Tools Reference Guide 842 ...