SiBE37-701_B
Piping Installation Point
Appendix
444
5.2
The Example of a Wrong Pattern
Note:
★
Available on request if the outdoor unit is above.
Wrong
Oil is collected to the outdoor
unit at the time of a stop,
because of bottom omission of
piping.
(V3039)
Wrong
Oil is collected to the low level outdoor
unit at the time of a stop, because of
downward slope of piping.
Good
Good
The example of installation on which oil is not collected.
Vertical
Projection
(V3040)
Max. allowable
Piping Length
Outdoor Unit - Multi Connection Piping Kit Actual piping length 10m or less, equivalent length 13m or less
Multi Connection Piping Kit - Indoor Unit
Actual piping length 165m or less, equivalent length 190m or
less, the total extension 1000m or less
REFNET Joint - Indoor Unit
Actual piping length 40m or less
(Refer to Page 448 Note 2 in case of up to 90m)
Allowable
Level
Difference
Outdoor Unit - Outdoor Unit
5m or less
Outdoor Unit - Indoor Unit
Outdoor Unit is above
50m or less
★
90m or less
Outdoor Unit is below
90m
Indoor Unit - Indoor Unit
15m or less
Summary of Contents for REYQ8-48PY1B
Page 1: ...Service Manual REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701_B ...
Page 456: ...Piping Installation Point SiBE37 701_B 445 Appendix ...
Page 460: ...Example of connection SiBE37 701_B 449 Appendix ...
Page 476: ...Revision History Date News No Contents 2010 9 10 M 10011 Correction of service manual ...