![Daikin REYQ8-48PY1B Service Manual Download Page 135](http://html.mh-extra.com/html/daikin/reyq8-48py1b/reyq8-48py1b_service-manual_502202135.webp)
SiBE37-701_B
Special Control
Function
124
3.3.2 Heating Oil Return Operation (including cooling / heating
simultaneous operation)
[Start conditions]
Referring to the following conditions, start heating oil return operation.
• Integral oil rise rate is reached to specified level.
• When cumulative compressor operating time exceeds 8 hours (2 hours when the power supply turns ON for
the first time)
Furthermore, the integral oil rise rate is calculated by Tc, Te, and compressor loads.
The higher the compressor operating step No., the cumulative refrigerant oil consumption increases.
*1: In case of multi outdoor unit system:
Master unit: It conducts the operation listed in the table above.
Slave units: Operating units conduct the operation listed in the table above.
Non-operating units conduct the operation listed in the table above after the "Oil returning" process.
(Non-operating units stop while in "Preparation" mode.)
Actuator
Symbol
Elect. symbol
Oil return operation
REYQ
REMQ
Compressor 1
—
M1C
M1C
Maintain load that was applied before oil return
operation.
When current circulation rate < circulation rate required
for oil return operation, turn ON the STD compressor
every 10 seconds (up to 3 units at maximum).
Compressor 2
M2C
M2C
Compressor 3
—
M3C
Outdoor unit fan 1
—
M1F
M1F
When outdoor unit heat exchanger is condenser, the
fan will run under cooling fan control.
When outdoor unit heat exchanger is evaporator, the
fan will run at the fan step 7 or 8.
Outdoor unit fan 2
M2F
M2F
Electronic expansion valve (Main)
EVM
Y1E
Y3E
Y1E
20SA=ON : PI control
20SA=OFF : 418pls
Electronic expansion valve
(Subcooling)
EVT
Y2E
Y5E
Y3E
PI control
Electronic expansion valve
(Refrigerant charge)
EVJ
Y4E
Y2E
80pls
Four way valve (Heat exchanger
switch)
20SA
Y2S
Y9S
Y3S
When outdoor unit heat exchanger is condenser, the
valve will turn OFF.
When outdoor unit heat exchanger is evaporator, the
valve will turn ON.
Four way valve (Dual pressure gas
pipe switch)
20SB
Y8S
Y2S
OFF
Solenoid valve (Main bypass)
SVE
Y5S
Y10S
Y6S
OFF
Solenoid valve (Hot gas)
SVP
Y4S
Y5S
0pls
Solenoid valve (Refrigerant regulator
liquid pipe)
SVL
Y3S
Y4S
0pls
Solenoid valve (Refrigerant regulator
gas vent pipe)
SVG
Y1S
Y1S
0pls
Solenoid valve (Refrigerant regulator
discharge pipe)
SVO
Y7S
Y7S
0pls
Solenoid valve (Refrigerant regulator
discharge pipe)
SVT
Y6S
Y8S
0pls
End conditions
•
Pe_min<0.22MPa
•
After a lapse of 9 min.
OR
or
Summary of Contents for REYQ8-48PY1B
Page 1: ...Service Manual REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701_B ...
Page 456: ...Piping Installation Point SiBE37 701_B 445 Appendix ...
Page 460: ...Example of connection SiBE37 701_B 449 Appendix ...
Page 476: ...Revision History Date News No Contents 2010 9 10 M 10011 Correction of service manual ...