SiBE37-701_B
Refrigerant Flow for Each Operation Mode
Refrigerant Circuit
102
2. When switching operation from heating to cooling
First, the electronic expansion valve and the solenoid valve for EVHS, EVH, EVL and EVLS
of the indoor unit will be closed.
Next, open the EVLS, and it makes to balance the system pressure.
Finally, EVL and EVLS are opened and the electronic expansion valve of the indoor unit is
opened to start the operation as a cooling circuit.
In heating
operation
In equalization
To cooling
operation
Indoor Unit
BS Unit
Heating
Unit
EVSC
Liquid
Pipe
EVHS
EVH
EVLS
EVL
Dual
Pressure
Gas Pipe
Suction
Pipe
Indoor Unit
BS Unit
EVSC
Liquid
Pipe
EVHS
(Close)
EVH
(Close)
EVLS
(Close)
EVL (Open)
Dual
Pressure
Gas Pipe
Suction
Pipe
(Close)
In
equalization
Indoor Unit
BS Unit
Cooling
Unit
EVSC
Liquid
Pipe
EVHS
EVH
EVLS
EVL
Dual
Pressure
Gas Pipe
Suction
Pipe
Summary of Contents for REYQ8-48PY1B
Page 1: ...Service Manual REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701_B ...
Page 456: ...Piping Installation Point SiBE37 701_B 445 Appendix ...
Page 460: ...Example of connection SiBE37 701_B 449 Appendix ...
Page 476: ...Revision History Date News No Contents 2010 9 10 M 10011 Correction of service manual ...