51
8. %*_ \\\`:
* * & %## &#&
to rigid Polypro at the base of the masonry or B vent chimney. In addition, observe the following requirements:
# $+ # *( & % &
vent pipe by the same manufacturer will also be required for the run from the boiler to the base of chimney.
b. Masonry chimneys cannot be used for an air chase
c. B vent chimneys can only be used for an air chase (Vent options 18, 19) if the B vent has the minimum size shown in
Table 7.13b and is fully accessible for sealing of all joints and seams.
d. When Vent Option 18 or 19 is used, install a Tee on the base of the B-vent that is the same size as the B- Vent chimney.
Install the PolyPro Lower B–Vent adaptor in the base of this Tee as described in the DuraVent PolyPro Flex instructions.
Connection of the PVC air intake pipe to the side outlet of the tee is made using a cap and a PVC socket x male thread
adaptor (2” or 3”, depending on the Vent Option). Cut a clearance hole in the cap for the male threads. Secure the
adaptor to the cap using a 2” or 3” electrical conduit lock nut. Seal all joints with RTV.
"$
$# #)&' ## %')) &&#
installer.
2. Assemble the vent system, starting at the boiler:
$#)&#'& && $#\'\ &&
(Figure 7.27). A locking ring in the adaptor prevents the vent pipe from coming out of the adaptor once it is inserted.
} #% #)&' # &'& # #
adaptor until it bottoms out.
+ &#)\&# & _`+ %
^+#' #*
c. For each joint, verify that the gasket is evenly seated in the bell (female) end of the pipe. Lubricate this gasket with mild
soapy water. Slide a Pipe Locking Band over the male end of the pipe to be joined as shown in Figure 7.41. Push the
male end of the next section of pipe into the bell until it bottoms out, then back out 1/8—1/4” to provide room for
thermal expansion. Slide pipe locking band over the female end of the connections and tighten both hose clamps.
& ##)#| \ % ## {
sections back towards the boiler 5/8” per ft.
"&
"B+>-(%BC+@*A?B(/
0
%BC+)*)*?)B(-*@(@)B
*)B(*?;:?(??)
)B( -
0
*%%C+);7-
0
(*?(%%+()(-A
(?()(BBA(?*-
"&
"B+>-?(((*
BBBA)B)((@FF-(((B(
)*(*(@(ABB)@B,(-
C*?FF((@)A
(A-
0
)+A)B,))((-
0
+))BB*BB)B-
0
")A)(***F*-
Summary of Contents for PHNTM080
Page 2: ......
Page 9: ...7 Figure 4 1 Minimum Clearances To Combustible Construction...
Page 11: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Page 12: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Page 39: ...37 FIGURE 7 24 SPLIT VENT SYSTEM FLEX IN ABANDONED MASONRY CHIMNEY VENT OPTIONS 33 38...
Page 63: ...61 This page is intentionally left blank...
Page 68: ...66 FIGURE 9 2 PIPING METHOD 1 NEAR BOILER PIPING HEATING ONLY...
Page 72: ...70 FIGURE 9 6 PIPING METHOD 1 NEAR BOILER PIPING SHADED BOILER LOOP...
Page 82: ...80 FIGURE 10 4 PROPER INSTALLATION OF HEADER SENSOR...
Page 84: ...82 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Page 85: ...83...
Page 92: ...90 Lighting and Operating Instructions...
Page 101: ...99 FIGURE 12 5 SETTINGS MENU SEE PART C FOR ADDITIONAL INFORMATION...
Page 113: ...111 FIGURE 13 2 IGNITION ELECTRODE GAP FIGURE 13 3 CONDENSATE TRAP EXPLODED PARTS VIEW...
Page 125: ...123...
Page 127: ...125 40 33 31 27 28 34 35 37 38 32 39 36 29 30 48 Blower Gas Valve Assembly for 80 100 120...
Page 129: ...127...
Page 131: ...129...
Page 132: ...130...
Page 133: ...131...
Page 135: ...133...
Page 137: ...135 140 141 142 143 144 145...