1. The components shown in Table 7.26 are supplied with this boiler for use in a 3” CPVC/PVC vent system. PVC piping must
&# # &) %&#
2. Assemble the vent system, starting at the boiler:
a. If 3” PVC is to be used for venting, the 3” CPVC elbow and the 30” straight section of CPVC provided with the
boiler must be used before transitioning to PVC. If necessary the 30” straight section of CPVC may be cut in any
location and the CPVC elbow inserted between the two resulting segments.
b. When cutting CPVC or PVC pipe, use a miter saw or a saw designed to cut PVC pipe. Use a miter box or other
method to cut pipe squarely. De-burr both the inside and outside of the cut end.
c. )
d. The vent adaptor has two different inside diameters. The larger (upper) inside diameter accepts 3” CPVC pipe and
& # _#\'\ && \^`
A locking ring in the adaptor prevents the vent pipe from coming out of the adaptor once it is inserted. Lubricate
#% #)&' #'& # "" #)&
bottoms out.
e. +"" &#)\&# "" & _`+""
using a CPVC reducing coupling or elbow. Otherwise assemble the 3” CPVC elbow and the remainder of the 30”
"" % %"" &\# "' #&#
CPVC elbow supplied with the boiler, or the end of a section of CPVC vent pipe. In the latter case, a PVC coupling
&# "# ""
f.
Clean all CPVC and PVC components with the appropriate primer before cementing. Cement the vent system
together, starting at the boiler and following the instructions provided on the cans of cement and primer. Use a
& && # &' ## %[ &_""&"`$#
following, or its equivalent, may be used to join CPVC to PVC:
Q
IPS Corporation #P-70 Primer
Q
IPS Corporation #790 Multi-Purpose Solvent Cement
' ## & % %## &' #
the instructions on the cans of primer and cement.
TABLE 7.26: CPVC/PVC VENT KIT COMPONENTS
QUANTITY
DESCRIPTION
SIZE
1
30” STRAIGHT CPVC PIPE
3”
1
CPVC ELBOW
3”
1
PVC COUPLING TERMINATION
3”
1
PVC 90° ELBOW TERMINATION
3”
2
RODENT SCREEN
3”
$!
$ABBB@.%$#)A-.F(
BBB@@*AB-
Summary of Contents for PHNTM080
Page 2: ......
Page 9: ...7 Figure 4 1 Minimum Clearances To Combustible Construction...
Page 11: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Page 12: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Page 39: ...37 FIGURE 7 24 SPLIT VENT SYSTEM FLEX IN ABANDONED MASONRY CHIMNEY VENT OPTIONS 33 38...
Page 63: ...61 This page is intentionally left blank...
Page 68: ...66 FIGURE 9 2 PIPING METHOD 1 NEAR BOILER PIPING HEATING ONLY...
Page 72: ...70 FIGURE 9 6 PIPING METHOD 1 NEAR BOILER PIPING SHADED BOILER LOOP...
Page 82: ...80 FIGURE 10 4 PROPER INSTALLATION OF HEADER SENSOR...
Page 84: ...82 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Page 85: ...83...
Page 92: ...90 Lighting and Operating Instructions...
Page 101: ...99 FIGURE 12 5 SETTINGS MENU SEE PART C FOR ADDITIONAL INFORMATION...
Page 113: ...111 FIGURE 13 2 IGNITION ELECTRODE GAP FIGURE 13 3 CONDENSATE TRAP EXPLODED PARTS VIEW...
Page 125: ...123...
Page 127: ...125 40 33 31 27 28 34 35 37 38 32 39 36 29 30 48 Blower Gas Valve Assembly for 80 100 120...
Page 129: ...127...
Page 131: ...129...
Page 132: ...130...
Page 133: ...131...
Page 135: ...133...
Page 137: ...135 140 141 142 143 144 145...