START-UP CHECKLIST FOR 30XV LIQUID CHILLERS
(Remove and use for Job File)
A. PROJECT INFORMATION
Job name
_____________________________________
Address
_____________________________________
City ______________________State ____Zip_________
Equipment tag/mark for____________________________
Installing contractor_______________________________
Sales office _____________________________________
Start-up performed by_____________________________
Design Information
Unit
Model ____________________________________ Serial________________________________________
Compressors
Compressor A
Model ____________________________________ Serial ________________________________________
Compressor B
Model ____________________________________ Serial________________________________________
Evaporator
Model ____________________________________ Serial ________________________________________
B. PRELIMINARY EQUIPMENT CHECK (This section to be completed by installing contractor)
1. Is there any physical damage?
Yes
No
Will this prevent start-up?
Yes
No
Description:
2. Unit is installed level as per the installation instructions.
Yes
No
3. Power supply agrees with the unit nameplate.
Yes
No
4. Correct control voltage ________vac.
Yes
No
5. Electrical power wiring is installed properly.
Yes
No
6. Unit is properly grounded.
Yes
No
7. Electrical circuit protection has been sized and installed properly.
Yes
No
8. All terminals are tight.
Yes
No
9. All plug assemblies are tight.
Yes
No
10. All cables, thermistors and transducers have been inspected for cross wires.
Yes
No
11. All thermistors are fully inserted into wells.
Yes
No
12. Oil separator heaters energized for 24 hours before start-up.
Yes
No
13. Relief valve vent piping per local codes.
Yes
No
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in preced-
ing sections of this Controls, Start-Up, Operation, Service and
Troubleshooting document.
CAPACITY
EWT
LWT
FLUID TYPE
FLOW RATE
P.D.
AMBIENT
Evaporator
Summary of Contents for AquaForce 30XV140
Page 79: ...79 Fig 76 VFD Communication Wiring Compressor A B Fan VFD A1 A2 B1 B2...
Page 228: ...228 Fig 90 30XV Typical Field Wiring Schematic cont...
Page 229: ...229 Fig 91 30XV Standard Tier 140 275 All Voltages Power Schematic NOTE See Legend on page 226...
Page 230: ...230 Fig 92 30XV Standard Tier 300 325 All Voltages Power Schematic NOTE See Legend on page 226...
Page 240: ...240 Fig 99 30XV Communication Wiring...
Page 241: ...241 Fig 100 30XV 115V Control Wiring All Tonnages All Voltages...
Page 242: ...242 Fig 101 30XV 24V Control Wiring 30XV140 325 All Voltages...
Page 243: ...243 Fig 101 30XV 24V Control Wiring 30XV140 325 All Voltages cont...
Page 244: ...244 Fig 102 30XV 24V Control Wiring 30XV350 500 All Voltages...
Page 245: ...245 Fig 102 30XV 24V Control Wiring 30XV350 500 All Voltages cont...
Page 246: ...246 Fig 103 Component Arrangement Diagram for 30XV140 325...
Page 247: ...247 Fig 103 Component Arrangement Diagram for 30XV140 325 cont...
Page 248: ...248 Fig 104 Component Arrangement Diagram for 30XV350 500...
Page 337: ...337 APPENDIX J FACTORY SUPPLIED PUMPS cont Fig L System Information...
Page 338: ...338 APPENDIX J FACTORY SUPPLIED PUMPS cont Fig M Unit and Language Settings...
Page 341: ...341 APPENDIX J FACTORY SUPPLIED PUMPS cont Fig P Data Input 2...
Page 342: ...342 APPENDIX J FACTORY SUPPLIED PUMPS cont Fig Q Data Input 3...
Page 347: ...347 APPENDIX J FACTORY SUPPLIED PUMPS cont Fig U Pump Wiring Diagram...