MAWA-050A
2. Installation and Connections
2-20
Terminal
No.
Terminal
name
Explanation
18
WIRE START Brazing wire supply start signal output terminal.
*1: For the synchronizing output timing, refer to timing charts in 6. (1), 6. (2), 6. (3), and 6. (4).