
MAWA-050A
5. Welding
5-1
5. Welding
WARNING
Do not measure the voltage by connecting a general voltmeter or oscilloscope to the output
terminal or between torch and base material. A high voltage of the start circuit is applied to
the output terminal. The measuring person may receive an electric shock or the measuring
apparatus may be damaged.
IMPORTANT
Use the welding power supply without exceeding the maximum duty cycle. (Refer to “1. (3)-3
Duty cycle graph.”) Using the welding power supply exceeding the maximum duty cycle will
result in “E03 Overheat error.”
(1) Pre-Start
Inspection
In the following, the pre-start inspection will be described.
Execute the following inspection items before starting welding daily. For the details of the
inspection items, refer to “9. (1) Pre-Start Inspection.”
Cable
inspection
Torch
inspection
Argon gas inspection