MAWA-050A
6. Timing Chart
6-13
(8) Schedule
Changeover
The following is a timing chart for the case where the schedule is changed over.
SCH1入力
SCH4入力
SCH8入力
PARITY入力
READY出力
SCH2入力
START入力
SCH1通電
SCH2通電
SCH3通電
SCH4通電
*3
*2
*1
*1 The time from a SCH No. changeover to the validation of the READY signal varies depending on the setting of the SCH
changeover delay time (Refer to 4. (6).).
After the lapse of the SCH changeover delay time, SCH No. is decided finally and welding data is created. The time required
to create welding data becomes longer in proportion to the set time of First w Second welding. It is about 1 ms at the
minimum weld time: 1 ms and about 340 ms at the maximum weld time: 4 s. From these contents, the time from the end of
SCH signal operation to READY signal ON becomes SCH changeover delay time (1 ~ 200 ms) + Welding data creating time (1
~ 340 ms).
The example shown in the above figure shows a case of SCH No. changeover in the sequence of 1
→
2
→
3
→
4.
*2 START signal input decision delay time. Refer to “4. (6)
(m) START signal input delay time.”
*3 Operate the PARITY signal until the START signal is input.
The use/no use of the PARITY signal can be set in the “Start parity error ON/OFF” item after displaying the Switch select screen
from the Basic setting screen. Refer to “4. (6) Switch Select Screen.”
SCH1 input
SCH2 input
SCH4 input
SCH8 input
PARITY input
READY input
START input
SCH1 welding
SCH2 welding
SCH3 welding
SCH4 welding